Search
Leave a Message
Thank you for your message. We will be in touch with you shortly.
Explore Our Properties
Two-story red-brick home with white entry columns, black shutters and a broad autumn lawn in clear morning light.

Buying in Solomons MD: The Thomas Johnson Bridge Commute

November 5, 2026

Two homes listed in September 2026 can sit a few miles apart, one in Solomons and one in California or Lexington Park, and still be in two different markets. Calvert County's active inventory rose 52% year over year that month, and its sellers got 96.4% of original list price on average. Across the Patuxent in St. Mary's County, inventory grew far less and sellers held at 98.5%.

The Gov. Thomas Johnson Memorial Bridge on MD Route 4 sits between those two markets. For anyone weighing Solomons against the Pax River side, the bridge belongs in the offer as a fixed condition of the house. The state's own schedule puts its replacement well beyond the life of a typical mortgage rate lock, a school year, or most job assignments.

Where the replacement actually stands

At the Maryland Department of Transportation's annual meeting with the Calvert County commissioners on Sept. 22, 2026, State Highway Administrator Will Pines laid out what comes next. The BayNet's account and The County Times' report describe the same sequence.

  1. Done: The NEPA study and record of decision, which set the bridge type and the project limits. SHA has also mapped the Patuxent River bed along the proposed alignment.
  2. Underway, expected by summer 2027: Navigation studies with the U.S. Coast Guard to determine how tall and wide the main span must be. Pines said a shorter, lower span means less concrete, smaller piers and simpler vessel protection, so these dimensions drive the cost.
  3. After that: A preliminary Coast Guard determination on clearances, then permits that include the U.S. Army Corps of Engineers and the Maryland Department of the Environment.
  4. Proposed next step, unfunded: A life-cycle cost assessment that compares the cost of maintaining the existing bridge with the cost of replacing it, and also weighs traffic, safety and funding options. The state has shared information with U.S. Sen. Chris Van Hollen's office to support a possible federal request.

No construction date has been set.

The money tells the same story. MDOT's draft FY 2027–2032 Consolidated Transportation Program page for Calvert describes a four-mile MD 4 study from MD 2 to MD 235. It includes the bridge and is drawn as a four-lane divided corridor with wide shoulders and shared-use path or sidewalk accommodations. The draft puts the estimated total cost of planning and engineering at $7.861 million, with $6.161 million spent through 2026 and $1.7 million budgeted for engineering in FY 2027. It shows nothing for right-of-way, utilities or construction. The BayNet reported that MDOT plans to submit the final version with the governor's budget in January 2027.

The local officials in the room were blunt about the gap. Commissioner Mike Hart told the state team, as The County Times reported, "Once you guys even green light it, it would be years before a car would go over the top of it," and added, "we just don't feel like we're any closer today than we were 10 years ago." Transportation Secretary Katie Thomson pointed to "very serious budgetary constraints." She said Congress needs to reenact a program that lets states tap significant federal funding for bridges like this one.

So a household buying in Solomons this fall should budget for the current two-lane crossing for as long as it expects to own the home.

What the current crossing asks of a commuter

Pines was direct about safety. "It's a fair condition bridge today," he said, according to The County Times. SHA inspects it regularly, and in his words, "if any bridge is not safe, it's not open to traffic." He also acknowledged that the main reason people want a new bridge is "the functional traffic related issues."

Those issues show up in a few predictable ways:

  • Recurring queues. At the same Sept. 22 meeting, Commissioner President Todd Ireland described traffic backed up the previous evening coming down the hill southbound, stopping north of Plum Point Road. Commissioner Mark Cox noted it happens some weeks and not others.
  • Overnight maintenance windows. SHA's May 2026 repair work, which began May 11, replaced bridge-joint seals and included welding. It ran overnight with single-lane flagging and alternating traffic, Sunday through Thursday. The November 2025 inspection, scheduled for Nov. 9 through Nov. 13, used the same overnight single-lane approach, and SHA advised travelers to allow extra time.
  • Full stops when something goes wrong. After a three-vehicle collision on the bridge on Oct. 16, 2025, The BayNet reported that traffic in both directions was turned around while crews cleared the scene, and the bridge reopened around 2 p.m.

For a Solomons household with someone working at Naval Air Station Patuxent River, those are the terms of the daily drive. The crossing is short on a good evening. It has no alternate route on a bad one.

Two markets on either side of the span

The September 2026 county reports from Maryland REALTORS, built on Bright MLS data current as of Oct. 12, 2026, and the Southern Maryland Association of REALTORS, calculated Oct. 8, 2026, show the two counties moving in different directions. These figures are county-wide, and Solomons is one part of Calvert.

September 2026 Calvert County St. Mary's County
Median sold price $475,000, flat from Sept. 2025 $425,000, up 3.8%
Closed sales 99, up 11.2% 93, down 28.5%
Active inventory 339, up from 223 276, up from 234
Months of inventory 3.2, up from 2.3 2.5, up from 2.2
Median days on market 25, up from 11 16, up from 14
Avg. sold price to original list 96.4%, down from 98.5% 98.5%, down from 98.7%

On the Calvert side, the median price held steady while sellers lost leverage. More homes were on the market, homes took more than twice as long to sell, and the gap between original asking price and final sale price widened. In SMAR's September breakdown, 23 of Calvert's 99 sales had spent more than 60 days on the market, compared with 14 of St. Mary's 93.

St. Mary's looks different. Fewer homes changed hands, pending sales fell 34.5%, and new listings dropped 13.3%, but the homes that did sell came close to their original asking price. New supply there is also contested. At an Oct. 6, 2026 joint meeting between the county and NAS Patuxent River, Land Use and Growth Management Director Jessica Andritz said Stanley Martin Homes had withdrawn a significant application to expand the Lexington Park Development District, according to The BayNet.

Both sides draw from overlapping buyer pools. VA loans financed 28 of Calvert's 99 September sales and 26 of St. Mary's 93. The same Oct. 6 meeting reviewed a Towson University regional workforce study, presented by St. Mary's Economic Development Director Cindy Greb, Towson's Shelby Francis and Stephanie Gleason of NAWCAD's Strategic Education Office. It named housing affordability among the region's recruitment challenges, along with competition from Northern Virginia and Washington.

Turning the crossing into a number

Here is how the bridge and the fall market connect for someone choosing Solomons. The commute cost is known and stable, because the state's schedule guarantees it. Calvert's September numbers show that buyers on this side have more room than they did a year ago to negotiate that cost into the price.

Using Calvert's averages, the drop from 98.5% to 96.4% of original list price works out to roughly $10,000 on a home originally listed at $475,000. That is a county-wide average and not a promise for any single listing. It does show the average gap below original list widening to 3.6 points in September 2026, up from 1.5 points in September 2025.

Practical ways to use it:

  • Drive the crossing at your real hours before you write an offer. Do it on a weeknight, southbound, past Plum Point Road, the stretch Ireland described. Do it more than once, since Cox noted the backups come and go week to week.
  • Ask how long the home has been listed. A Solomons home listed for 60 or more days falls into a group that made up nearly a quarter of Calvert's September sales.
  • Compare the full cost of each option. Put the Pax River-side home's firmer pricing next to the Solomons home's negotiating room and the time you will spend on the bridge. Treat that time as a fixed cost for as long as you expect to own the home.
  • Keep an eye on January 2027. The final transportation program arrives with the governor's budget, and it will show whether any construction dollars appear.

Common questions

Is the Thomas Johnson Bridge safe to use daily?

SHA Administrator Will Pines told the Calvert commissioners on Sept. 22, 2026 that the bridge is rated in fair condition, is inspected regularly, and remains safe.

What would the new bridge look like?

MDOT's draft program describes a four-lane divided MD 4 corridor from MD 2 to MD 235 with wide shoulders and shared-use path or sidewalk accommodations. The main span's height and width depend on the Coast Guard navigation studies expected by summer 2027.

Does the bridge show up in Solomons home prices?

The county data can't isolate it. What it does show is that in September 2026 Calvert's median held at $475,000 while days on market and the gap from original list price both grew, and that gives buyers more room to account for the commute.

If you're weighing a Solomons home against one on the Pax River side, Amber Verdadero can pull recent sales for the specific streets you're considering and help you set a price that accounts for the crossing. Get your instant home valuation or schedule a free consultation.

Follow Us On Instagram